RK · Sales Team
The Sales Floor

Marketing

Tools, the project overview, brand center, and the assets the team ships.

A film strip with a play control
01

Video Marketing Hub

The one-sheeter, landing page, field guide, case studies and testimonial videos — everything for selling Rankings Video. Open the hub
Overlapping metric series climbing
02

Marketing Team Dashboard

Inbound leads, podcast, YouTube, newsletter, social, and the content actually touching pipeline — monthly. Open dashboard
A dense grid of directory entries
03

The Book

The conference contact directory — who was in the room, how to reach them, built for the phone. Open the directory
Project timeline bars crossing a lit today line
01

Marketing Project Overview

Everything open in ClickUp: what’s due, what’s late, work by department, the calendar and the roadmap. Refreshes every morning at 7. Open in Claude
Rankings.io GOAT mark
Rankings 2.0 · Brand voice

We get you more than rankings — we get you cases.

Midnight
#14364d
Tuxedo
#282828
Sky
#3a93cf
Chartreuse
#c6e005
Flax
#eedc82
Suede
#fcfaec
Display · Roslindale
Recognized Authority
Roslindale Display · 600
AaBbCc · 0123456789 — headlines, numbers, pull quotes.
Body · Satoshi
Clear, direct copy.
Satoshi · 400 / 500 / 700
AaBbCc · 0123456789 — running text, labels, UI.
A

Logo pack

SVG · PNG · Mono
B

Brand deck

PDF · Rankings 2.0
C

One-pager template

Editable · Asset Generator
Recently created Sample · Editable
A team collaborating over a laptop in a bright workspace
01

Q3 Campaign — Social Set

Six-post run for the Recognized Authority push — LinkedIn + X, sized and captioned. Open in Asset Generator
A person reading at a desk beside a window
02

Recognized Authority eBook

24-page lead magnet on modern search for PI firms — cover, layout, and gated landing copy. View the eBook
A speaker presenting to a seated audience
03

PIMCon Sizzle

60-second event hype cut for social and the ticket page — sourced from last year's floor. Watch the cut
Content Ops · ClickUp Embed slot · paste a public link

Paste a public ClickUp embed link to connect this view

Set the src on #clickup-embed above. ClickUp views must be shared Public to embed — use the view’s Share › Public › Embed URL.